Wednesday, February 2, 2011

Potential Paint Tips

1 comments
Andi and I have now painted about half of our apartment. We've used a spray gun, rollers, brushes, little detailed paintbrushes, fingers, etc. to paint different portions of the unit. As a result, we've learned a thing or two that may or may not help someone who is about to paint their own apartment and who may or may not be looking for tips. I am going to err on the side of too much information is a good thing and do my part to overload the information super-highway. Here are 10 painting tips that may or may not be useful. Or even applicable to painting.

Tip #1: Spray guns are finicky. Theoretically they paint a surface smoothly and quickly. Practically, they paint a surface. And not always smoothly and quickly. Most commonly, the paint is too thick and clogs the spray nozzle—especially primer. Primer usually contains filling and binding agents that make spraying through fine spray nozzles very difficult. I was told that you could “thin” paint and/or primer with water, but I also read water reduces the effectiveness of the paint and/or primer. What to do?!?! So I loaded the gun sans thinner and hoped for the best. That meant I stopped and cleaned the gun about every 50sf of wall area or so. Or about 5 minutes of solid spray time before the gun started spitting like a llama.

Tip #2: Spray guns cover a lot of stuff. Pipes, conduit, ducts, sheet metal, mouse traps, redwood siding, cloth and windows are no match for a spray gun. If the target surface is properly prepared, the spray gun will give you the best, and quickest, paint cover over odd obstructions. Painting nooks and crannies with a brush is labor intensive, and pretty much just sucks.

The painted pipes, duct, sheet metal and redwood siding.
Tip #3: Latex paint does NOT bind to oil-based paint very well. When we prepped the trim for new paint, the existing uppermost layer of latex paint pealed away in large swaths of failure and disappointment since it was applied directly to a layer of oil-based paint. To avoid this feeling of paint rejection you need to remove the top layer of latex paint with a scraper or your finger nails, sand the jagged edges or corners and areas where the latex was too stupidly stubborn to peel off, and prime. That is the only way you’ll get the final coat of latex paint to bind to the existing surface adequately. And look decent. Painting over areas where the original paint has peeled looks like you painted over areas where the original paint has peeled.

Tip #4: Oil-based paint works best on trim since it goes on in one coat and self-levels itself, removing any indication of brush strokes. We did not learn this from experience—I saw it on a 30-second infomercial on HGTV. That tip would have really come in handy when we painted our trim.

Tip #5: When using a roller, first brush the paint out 6” from any trim, corners, and areas where the color changes. This allows you roll away with little repercussions, kind of like high-roller on a hot craps table. In addition, a brush stroke looks a lot different than a rolled stroke. I prefer the aesthetic of a rolled stroke so rolling after brushing blends the two techniques better.

Tip #6: When painting with a brush, apply the paint in long horizontal or vertical strokes. Follow these directions:

1.     Apply copious amounts of paint to the brush but not too much that you’re dripping all over your hand, the floor, or anything else that you want to avoid getting paint on (maybe your Harry Potter book collection?).
2.     Apply the paint evenly in one direction (maybe a 3’ length).
3.     Flip the brush over and apply the paint over the same area in the opposite direction, starting just past where you ended your first stroke and extending just past the spot where your first stroke started.
4.     Repeat steps 2 & 3 about 1-2 more times until you need more paint on the brush.
5.     GOTO 1 (and move down, up or over on the wall).

Do not start a stroke in the middle of a wet area. Latex paint starts drying pretty quickly. You will just remove some of the paint from the area and will have to touch it up later.


And don’t forget to breath, Daniel-san.

Tip #7: This may be obvious to most but was somewhat of a surprise to us: rolling uses a helluva lot more material than brushing.

Tip #8: Paintbrushes and roller covers have a shelf life. They are not immortal, like the great Gary Busey, especially if cared for poorly. So take care of them! Wash thoroughly.

Tip #9: Everything always looks better after a second coat.

Tip #10: Blue painter’s tape does little to stop the paint from creeping under the tape. Touch up at edges is always necessary. If someone has a tip on how to seal the tape to an edge better, we’re all ears.

Dean

Tuesday, January 25, 2011

Show You The Door

1 comments
The grossest area of our apartment was the laundry room. We took care of that. This brings me to the second grossest thing in our apartment: the front door. These are defining features:

The front door with the dirty curtain.
·          Dirty smudges everywhere that we cannot wipe off
·          A jagged mail slot (cut with a hatchet?). Also dirty.
·          A dingy curtain, dabbled with what appears to be soy sauce and also exhaust from the street
·          Numerous broken locks hanging on it

Key descriptive terms are “dirty” and “unsettling.” In the threshold where we welcome guests and pass through after long days out in the world! It will not do.


The jagged mailslot and dirty door,
after I started painting it in C2
Paint's Nightspot.

We took the door off the hinges (well, Dean did it. The door is about 9 feet tall and weighs a hundred pounds).  I taped off the window, removed the hardware, and painted it in high gloss deep blue (C2 Paint in Nightspot). It is very elegant and unexpected.

I went online to find a metal plate to frame the jagged mail slot. We did not want to cut a bigger slot, nor did we want our Sunset magazines and frequent flier statements to get caught on a plate that was too small. It was very difficult to find in 8.25” x 1.25”, and the few I found were $75+. I prefer to spend that amount of money on sushi and haircuts.

So I went back to my fav spot: the salvage yard. There, in a giant box of mail slot plates, I found the right size for $1.50. It needed a coat of paint because the metal was not shiny, nor did it look like it ever would be again. But that was fine by me. I painted and installed it and it looks sleek.

The final step was curtains. Dean and I prefer window coverings to be inconspicuous, allowing the architecture to shine.  However, all of our neighbors have white curtains on their front doors, and we wanted our door to be visually congruous from the outside.

A finished door with faux frosted
glass.

After: Mail slot with painted frame.
We picked a product at Home Depot called Light Effects Textured Window Film. It is a plastic film that gives the illusion of frosted glass, but you can remove it at any time because there are no adhesives used to affix it to the window. There are many similar products that are permanent, but we wanted a low level of commitment. Because, again, we were not sure how it would jive with the neighbors’ doors until tested.

We applied this product by cutting a piece to the exact size of the window with a straight edge and razor blade. Next we sprayed soapy water on the window. Then we put the custom-cut plastic film on, and smoothed out bubbles with the edge of a credit card (or a putty knife, if you want to be professional about it). It looks pretty good!


Question: Do you think it is visually cohesive with our neighbors’ doors? There is some debate in the building, but everyone seems ok with it.


The door from the outside, on the left. What do you think of the frosted glass?

The unrenovated hinges :(

The final step in the door renovation will be to do something about the hinges. They are painted over and, while still functional, need to be freshened up.

Throughout the house I have removed hinges from built-in cabinets. I boil the hinges in water with baking soda. Layers and layers of old paint easily comes off in globs, much like the consistency of dead vampires on True Blood. Then it is a cinch to polish up the hinges with Brasso, and re-attach them to the cabinet, fresh and shiny.


Dean is a little concerned about removing the hinges from the front door. If we do not re-attach them with precision, the door will not open and close well. We noticed this problem on one of our china cabinet cupboards after I boiled and re-attached the hinges, but it is not a critical because we rarely open that cabinet.


Has anyone ever re-hung a heavy door after removing the hinges? Any tips? Or should we just paint over the hinges and call it a day?

Andi

Monday, January 17, 2011

Powder Room Progress

2 comments
I have been ignoring my loyal readers of Project: Nest. I blame the holidays and writer's block (read: laziness). The new, and more frequent, blog posting begins today!

Soon after after Andi's last blog post, we found out that our plumbers were stuck at another job site and postponed the work on our project until after the holidays. I hoped to have fixtures installed before our guests arrived for our Christmas shindig (you know, to show off a little bit). Oh well. Since the plumbing was delayed, we had to delay our electrician as well. Electricians generally prefer to do their work after the plumbing is installed because plumbers are like bulldozers and plow stuff out of the way of their pipes if needed.

Yet there was still work to be done. I demo-ed the plaster on the wall where the sink will be hung because I need to install a backing plate for the sink. (A backing plate is a dimensioned lumber member that spans from stud-to-stud that I can bolt the sink to using lag bolts.) I certainly don't want someone ripping it off the wall in the midst of a drunken escapade during one of our wild parties. Because we have SO many of them. I also installed the door frame, enclosed the powder room in gyp board, and built the bathroom soffit with the help from Project: Nest friend Chris May--our first returning character!

Chris's and my handiwork.
The powder room is ready for wandering Christmas eyes.
Christmas came and went and we had a wonderful time hosting Andi's family. Our apartment proved very capable of handling families during the holiday season and will undoubtedly host many more Christmases and Thanksgivings. And maybe a New Year's Eve party or two. And a Sweetest Day card exchange.

The hired plumbers showed up for work on January 3. After our walk-through of the project, and some exploratory drilling for pipe placement, we realized that we were not on the same page financially as the plumber. Apparently the plumber did not bid the job as we asked him to and we did not understand his quote well enough to pick up on the discrepancy. A miscommunication, really. But we had to part ways with him because his revised quote became significantly greater than the other quotes.

So we hired a different plumber: Nigel Mulgrew Plumbing. Nigel, the charasmatic Irish-born faceman of the company, and Mervyn, the smiley, efficient, Guatemalan plumber, began the work January 12 and are a fantastic team. They (meaning Mervyn and his helper Julio) have done excellent work so far. Mervyn has installed the waste and vent pipes in our unit. Additionally, our upstairs neighbors decided to expedite their own powder room, and Nigel was happy to increase the scope of the project, so Mervyn has installed their waste and vent as well.

The waste and vent pipes in our garage.

Our neighbors' waste line and our vent line in our utility room. Our vent continues up into our neighbors' unit and connects with an existing vent line in their utility room. Their waste continues down into the garage and connects with the existing sanitary sewer.
The waste and vent pipes in the powder room. The rag is stuffed in the waste pipe for the sink.
While Mervyn hung the pipes, I finished hanging the gypsum board in the exterior of the new wall, taped, mudded, and sanded the wall. Not an easy thing to do well, but Andi and I think we did ok (she helped me sand). I installed metal corner strips to protect the delicate gyp board corners and taped and mudded them in place as well.

Feast your eyes on our gyp board finishing skillz!
I also hung the new door. Earlier, Andi and I visited Building REsources (where we also donated our old door and frame) and found some brass screws, hinges and a door strike for the new door. I used a wood chisel to mortise the hinges into the door frame--almost perfectly (I was a little bit off on the bottom hinge so the mortise is a little large). Finally, Andi and I patched the plaster around the new door by installing gyp board inside the gaps between the demo-ed plaster and new door frame and mudded and taped the areas that might not get covered by the new door trim. We made a visit to SF Victoriana, a shop that specializes in Victorian trim and ornamentation, to buy trim for the door, but they don't have our trim in stock. We will have to have it custom made.

Does anyone know of a good carpenter that could make our trim?

The rescued $75 door in all of its glory.
The mortised hinge.Finally, I got the architectural permit! It was freakin' expensive. $382.14 for me to sit in their office for 2.5 hours and have 4 different people look at the plans for a grand total of 15 minutes. This is why the San Francisco Department of Building Inspections gets bad *yelp ratings.

Check out our wonderfully expensive building permit drawings. Now we only have to pay $250/inspection.
Oh yeah, we bought the toilet too.

Dean

Sunday, December 12, 2010

A Table for Big Parties

0 comments
Dean and I are hosting my family for Xmas this year. It is not a big whoop: just seven people.  Other than our apartment being under construction, the only catch is that our table only seats four people.
The X-Pand: our dream table

The Portica Table from Room and Board

We looked around for a bigger table and only found a couple that we really liked. The X-Pand table from Propeller Modern was what we really wanted. It does not have a leaf, but a built in accordion-like function that allows you to pull the table out to be 18” longer. Super cool. Also $3,500. We debated splurging on it, but decided that we have been splurging on quite a few things lately and have to draw the line somewhere.

Another one that we really liked was the Portica table from Room and Board, with a white stone top. This one was $2,400 in the size and finish we wanted.  We liked the idea of a stone top because, like many city dwellers, we have one table where every meal goes down. That table has to be durable and look nice despite heavy use.

In the end we could not decide on an expensive table under time pressure. So I turned to craigslist. It is my numero uno favorite hobby to troll craigslist for furniture, so I was fine with this solution.

The spindled legs that sold me on the antique table. We plan on buying white, modern chairs for the
table, and set rid of the current mismash of chairs.
The table I choose was $200, an antique from someone’s great aunt’s house in Staten Island. I really loved the spindle legs, which is what propelled me to reserve a City Car Share truck on a Tuesday night and drive 35 miles to Los Gatos, after work, to pick up this very heavy behemoth.  Dean was not super charmed by this situation or the table, but he was a sport and acknowledged its attractive economic qualities.

We forgot to take a "before" picture, but the
mismatched leaf was as garrish as this one.
The table’s big flaw was that the leaf was obviously not original to the table. The leaf was a different color wood, and the grain ran in a different direction than the wood on the table. Which makes no sense to me: if you are going to have a custom leaf made, shouldn’t it match the existing table? Or maybe the granny who owned the table always used tablecloths, as grannies do. Who knows.

Our solution was to paint the table top a dark brown, to complement our dining room walls, and then put 3 coats of polyurethane lacquer on the top. 

It was pretty simple, as long as you remember to let it dry for 6 hours between coats. The “self-leveling” polyurethane did not dry to be glassine smooth, like a still lake, but they are good enough for me (except one paintbrush bristle is fossilized in the lacquer on the north end of the table. I choose to sit on the south end because it is bothering me).  



The table and reflecting tree!

The best part is the shiny surface reflects the architecture of the apartment beautifully. Depending on where I sit I see the built-in china cabinet, the lights from our Christmas  tree, or the amazing front windows reflected on my table.

The reflecting table with our new window coverings from Ikea. Another recent accomplishment: we took
down all of the metal mini blinds throughout the house and replaced them with better window treatments.

David's bum, and our table.
This week Dean and I also hired a cleaning lady for the first time in our lives. The construction dust has gotten the best of us. Ernestina, our amazing new cleaning professional, walked into our house, pointed to the shiny table, and said “me gusta!” Excellent first review!

-Andi

Tuesday, November 30, 2010

The Powder Room in Under 1,100 Words, Not Including Footnotes

2 comments
Well, it’s been a long time. Not because we haven’t been involved in any home improvements[1], but mostly because I’ve been busy (Andi’s Note: lazy) and haven’t had (AN: taken) the time to write a new blog (AN: it’s his turn).  Andi and I are on vacay in Michigan for the Thanksgiving holiday and, at the moment, we’re sitting on Rocco’s couch in The D watching Eat, Pray, Love so I figure I have about 140 minutes to write a blog entry[2].

Where to start… about six weeks ago we began the powder room renovation. And when I say “began” I mean I called a couple of plumbers and scheduled some times for a free estimate. That snowballed into demo of some of the interior walls of the existing closet that is being changed into the powder room[3], demo of the existing disgusting vinyl floor, removal of the existing door and frame for reuse in a different location (we’re moving the door—see the new plans), new framing for a new ceiling[4], and the beginnings of some new wall framing to extend the room about 8” so that we achieve the full 24” of clearance required by the city from the front edge of the toilet to any obstruction directly in front of the toilet (read: sink).[5]

Is this door demo or has there been a nuclear fall-out?
Framing the wall that extends the bathroom 8".
Then we got a knock on our door. It was our neighbors. From upstairs. They heard the pounding and the cutting and the demolition and read the note that we left for all of the tenants in the building outlining our renovation. They wanted in. They are updating their apartment as well and will eventually add a powder room to their unit. They wanted to split the cost of the rough plumbing and extend it to their apartment so that it’s A) cheaper as a package deal and B) less of a disturbance to us at a later date.  We agreed.

So we started the bid process over again. I quickly (AN: not so quickly) revised our floor plan, drew one up for our neighbor’s apartment, and sent the two new plans back to the plumbers for review and update their quote if needed[6]. Then I headed to the San Francisco Department of Building Inspections to get a permit for our plumbing and electrical work where I was told 1) that the licensed plumbing and electrical contractor must pull the permit for the work if I am not a licensed contractor myself, 2) that I need a architectural permit since I am changing the Use of the space from a Closet to a Bathroom, and 3) that I need a stamp and signature from a licensed Architect in the state of California on the drawings since I am moving the door from one wall to another and that wall might be a Structural Wall. That was the biggest kick in the jewels. I am an architect—by effort and trade, not officially by title since I need to pass 9 national registration exams (which I have) and 1 additional statewide exam (which I have not) to become a licensed Architect in the state of California. If I were in Michigan, I would be a delinquent paying member of the AIA. So I can’t even stamp and sign my own drawings. Ugh.

Luckily for me, I know a lot of Architects with a capital ‘A’. I spammed them all with the following email:

“Help! I’m officially not an Architect in the state of California and I can’t stamp and sign my own drawings, as required by the city of San Francisco, for a powder room renovation in my own apartment. Which one of you is willing to risk their professional reputation and registration for my silly little renovation?”

Two people responded. One favorably; one asking, “why in the hell are you not licensed ~?!~” (Don’t ask about the punctuation.) My boss asks me the same question at work every day. I tell him the world has enough Architects.

In all seriousness, thanks to my friend Paul for stepping up and offering to help us out with the permit. He graciously stopped by the apartment, reviewed the plans, observed the construction site, listened to my non-sensical babbling about door framing, and agreed to stamp and sign the drawings for permit with minimal fee.

With Paul’s blessing I felt comfortable continuing with the renovation. Andi and I selected a plumber, Professor Plumb, and scheduled them for their first available slot. Unfortunately that slot is not for two weeks. (It’s amazing that the world does not revolve around my powder room.) In the meantime there is much work to be done before the plumbers arrive: get an architectural permit, rough frame the new door, finish the framing of the alcove ceiling, and frame a new soffit for the toilet alcove. My friend and old roommate Steve offered his muscle for a day and we pounded out items 2 and 3 in the previous sentence while battling power shortages (we had to juggle rechargeable batteries all day because neither of my batteries were fully charged even though they were in the recharging dock for the last 10 days), broken tools (Steve sheered one side of my #2 Phillips head screw driver bit off completely while screwing our boxed header together and we wore down the teeth of the reciprocating saw so badly that we basically burned the studs in half until we trudged down to our Local Hardware Store and bought new blades), and general scratch-our-head-because-we-were-not-really-sure-what-to-do-next-itus (a tough thing to overcome, kind of like writer’s block or ED—we used pizza and alcohol). But the rough opening for the door is framed[7]. And the alcove ceiling too. And a question was raised for our plumbing contractor: do I need to demo the plaster on the entire wall with the wall-hung sink in order to install the plumbing waste and vent pipes or can they install the pipes with minimal demo?


The magnificent door header.

Steve and me and our semi-handy work.
So that’s where we are. Our schedule remains somewhat in tact. The next step is to call the plumber and ask him about the plaster demo. If he requires additional space to install his rough plumbing, I will demo the existing plaster in the wall with the wall-hung sink. Then frame the soffit in the toilet alcove. Then hang the door and frame (after I purchase new/used hinges and re-rout the door and frame for the hinges). Then drywall. Then paint, floor finishes, plumbing and electrical finishes, and finally trim.

Dean


[1] We’ve purchased and installed translucent blinds for the windows around the lightwell; we’ve purchased floor tiles for the powder room; we’ve purchased and received the sink, light fixture, and ductless exhaust fan for the powder room; we’ve tendered bids for the electrical work for the powder room, office, and living room as well as a bid for the custom shelving and desk in the office; we’ve purchased, received, and partially installed blinds for the bedrooms and kitchen; we’ve purchased and received the wall mount for our tv; we purchased rug(s) for our living room; and we’ve purchased, picked up, disassembled, moved in, reassembled, and partially painted our new/used dining room table.

[2] I actually didn’t finish this blog during the movie. I got too wrapped up in Julia Robert’s quest for balance.

[3] Interesting discovery while demo-ing the plaster walls—the wall between the closet and the hallway is actually two stud walls with three layers of plaster (finish on exterior side of outer wall, finish on exterior side of inner wall, and finish on interior side of inner wall—if that makes sense). The REALLY interesting find was that the exterior finish on the interior wall actually had a wainscot, which means that the inner wall was the original wall and the outer wall was added at a later date, most likely when the electricity was added to the unit. In addition, I found an old gas line capped and sticking out of the inner wall. I’m guessing this was for a gas lamp back in the olden days.

A sample cut of the inner wall wainscot.
[4] This went poorly until I bought joist hangers from our Local Hardware Store.

Framing the ceiling. I desperately needed joist hangers. You can still see the back of the exterior finish
of the inner wall on the right side of the pic.
[5] Both plumbers donated this little junket of info in their free estimate.

[6] In the process of revising the plan for our powder room I realized that I could not reuse the existing door from the closet because of two reasons. First, I wanted to keep plaster damage to a minimum in the hallway since plaster repair is difficult and expensive to do correctly, especially when the plaster dates to the turn of the 20th century. Therefore I wanted to limit the amount of studs I removed from the outer layer of the powder room wall to one stud (that stud would be interior to the opening of the door frame). Since the existing studs are spaced at approximately 16” on-center, the spacing between the first and third studs is exactly 30 ½”. After adding 2x4 king studs inside the remaining existing studs for the door framing, the rough opening is 27 ½”. As a rule, the rough opening for a door is 2” greater than the width of the door. The existing door is a 28” door. For a 28” door I need a rough opening of 30”. Secondly, the existing door is 8’-2” tall. 8’-2”! That is a tall door (although 9” shorter than the tallest man in the world) and the tallest in our apartment. (For a closet? Really?) When I lowered the ceiling from 9’-6” to 8’-4” (one of the plumbers mentioned that high ceilings in small spaces accentual sound in the space—not desirable in a bathroom, if you know what I mean), I inadvertently made framing an 8’-2” door almost impossible without removing some of the ceiling framing already in place. In addition, and 8’-2” door in a room with an 8’-4” ceiling height would look weird. After much discussion, and convincing, we bought a new/used 24” wide, 6’-7” tall, 4-panel Victorian door from Building REsources for $75 for our powder room door. Rough opening dimension required: 26” x 6’-10”.

[7] Our biggest challenge came from the removal of the existing wall sill and baseboard trim. The sill was nailed to the floor with humungous nails and the baseboard trim was difficult to cut through without damaging the floors. We had to pry the sill off the floor with a pry bar and we used the reciprocating saw to cut the baseboard to the floor. Carefully.